HUAWEI BTS 3606 PDF

All the outdoor units including BTSAC and RRU comply with either With Huawei latest CDMA BTS products, based upon the physical. Widely deployed in Reliance’s network, Huawei’s BTS AC-R is designed to handle high temperatures and power failures in India. Find solutions to your huawei bts question. Get free help, tips & support from top experts on huawei bts related issues.

Author: Gokasa Jukus
Country: Burkina Faso
Language: English (Spanish)
Genre: Technology
Published (Last): 6 January 2008
Pages: 236
PDF File Size: 8.32 Mb
ePub File Size: 11.2 Mb
ISBN: 559-3-56987-324-9
Downloads: 45751
Price: Free* [*Free Regsitration Required]
Uploader: Vozilkree

Figure shows how to install a BTS cabinet on the cement floor. Seperti diketahui, Huawei Ascend D2 hadir mengusung layar IPS berukuran 5 inchi dengan resolusi x piksel serta disokong oleh prosesor quad-core milik Huawei Sendiri, yakni K3V2 berkecepatan hts.

Each RRU supports two carriers. Administration Building, Huawei Technologies Co. Frequency scanning and analysis. Cdma Btse Hardware Systemissue1. Tighten the bolts on the cover.

And can be software upgrade to support GPRS services. Nadun has 3 jobs listed on their profile. It enables flexible coverage along railway lines, especially tunnels and bridges. O 2 Configuration The O 2 refers to an omni cell with two carriers. This section introduces how to install the power module and what to pay attention during the installation. If the power supply is on during the operation, do not touch the binding posts with the adjustable wrench or the screwdriver.

Ajmal has 4 jobs listed on their profile. Watch out for the sharp edges on the RF fan panel during the installation of RF cables lest it hurt your fingers. Chapter 1 Installation Preparations introduces how to arrange the personnel arrangement, check the installation environment check, prepare project plan and make kickoff coordination, and conduct the unpacking check. Ahmed has 6 jobs listed on their profile. The BTS in the multi-channel mode does not support the power synthesis function.

  ELDAR SPREKEN EN ZINGEN PDF

Thus, you do not need to install these cables on site. If the digital power and amplifier power are normal, the antenna feeder may be connected abnormally.

You may also be intersted in access control ac ap These modules can be flexibly configured to meet a variety of usage requirements.

Make sure that all the power modules are well connected with the backplanes, and that other boards and modules such as the CTRM and CHPA are not inserted in the slots of the backplanes. The following table shows the specifications of the BTS Table 2: Normally, the fan box is installed upon delivery.

GND cables for indoor cabling racks and for outdoor cabling racks. Means a complementary description. Rahmat has 5 jobs listed on their profile. Page of 93 Go. The cabinet is placed upside down. When positioning the cabinet, try to avoid the interference between the installation supports and the antistatic floor framework.

Hassan has 3 jobs listed on their profile. Other Cables The power cable and the grounding cable are routed straight and bundled neatly. Place the support below the antistatic floor.

Huawei BTS3606 Installation Manual

Ve el perfil completo en LinkedIn y descubre los contactos y empleos de Mustapha en empresas similares. Chapter 4 Installing Cables Thus, you do not need to install these cables on site.

  CONDICION FIBROQUISTICA PDF

Muhammad Waleed menyenaraikan 6 pekerjaan pada profil mereka. View Shafir Salam K A. If the outer package is damaged or soaked; or the equipment is soaked and becomes rusty, stop unpacking and find the cause. Huawei cdma bts Mohsan has 4 jobs listed on their profile. Each RRU supports a maximum of six levels of cascading.

HUAWEI BTS INSTALLATION MANUAL Pdf Download.

This manual also for: If you don’t have yet, click here to download Skype. Leap, headquartered in San Diego, Calif. Lead the cables into their corresponding cable-fixing troughs. Page 15 The packing case is in good condition. Good Experience on handling project rollouts. Table of Contents Add to my manuals Add. Determine the length of the huaqei cables according to their actual cabling path, that is, the route from the binding post of BTS cabinet to the wiring uuawei of the grounding protection bar of the cabinet.

The packing case is in good condition. We used 2 types of BTS: Huawei CBTS and DBS sites expansion onsite hardware installation and remote commissioning on around 60 sitesnew sites remote commissioning around 50 sites and new sites end-to-end construction supervision 10 sites.